Marrowbone Dam Photo Gallery
NRCS is using a new construction technique to rehabilitate Marrowbone Creek
Dam. Rehabilitating the dam will ensure that it meets current dam design and
safety criteria. If left uncorrected, the lives of approximately 160 residents
and 72 commuters would be at risk. In addition, 39 homes, two businesses,
a water treatment facility building, and four roads could be flooded, causing
approximately $2,000,000 in damages.
To follow the dam rehabilitation progress, photos will be updated regularly
until the project is complete.
To View/Download a Photo:
- Click on the photo to view it; the image will open in a new
window
- To download the image, right click it and choose "Save Picture
As..."
- Click the
in the upper right corner to close the new window
|
|

February, 2004
Marrowbone Creek Dam before construction. |

June, 2005
The lake is lowered to permit work on the riser. |

June, 2005
The stilling basin is being excavated and formwork for the Roller-
Compacted Concrete (RCC) is being erected. |

June, 2005
The dam is being excavated to shape the inlet of the new RCC spillway. |
|

June, 2005
An excavator is being used to shape the foundation of the stilling
basin.
|
|
|
|